
Table of contents
A5E02446774A AB
4 Siemens AG Operating Instructions V2.00 1PH8
6.2.2 Cable entry and routing............................................................................................................... 35
6.2.3 Electrical connection data ........................................................................................................... 36
6.2.4 Terminal designation................................................................................................................... 37
6.2.5 Connection with cable lugs ......................................................................................................... 37
6.2.6 Connect up the ground conductor............................................................................................... 38
6.2.7 Internal equipotential bonding..................................................................................................... 39
6.2.8 Circuit diagram ............................................................................................................................ 39
6.2.9 Connecting the speed encoder ................................................................................................... 40
6.2.10 Connecting the temperature sensor............................................................................................ 40
6.2.11 Connection to a converter........................................................................................................... 41
6.2.12 Converter operation on a grounded network .............................................................................. 41
6.2.13 Final steps................................................................................................................................... 42
7 Commissioning ........................................................................................................................................ 43
7.1 Measures to be performed prior to commissioning..................................................................... 43
7.2 Trial run ....................................................................................................................................... 45
7.3 Checking insulation resistance ................................................................................................... 45
7.4 Switching on................................................................................................................................ 47
8 Operation................................................................................................................................................. 49
8.1 Safety notes during operation ..................................................................................................... 49
8.2 Do not operate without cooling water supply .............................................................................. 50
8.3 Stoppages ................................................................................................................................... 51
8.4 Switching off................................................................................................................................ 51
8.5 Faults........................................................................................................................................... 51
8.5.1 Electrical faults ............................................................................................................................ 51
8.5.2 Mechanical faults ........................................................................................................................ 53
9 Maintenance ............................................................................................................................................ 55
9.1 Inspection and maintenance ....................................................................................................... 55
9.1.1 Inspection.................................................................................................................................... 55
9.1.1.1 Initial inspection........................................................................................................................... 55
9.1.1.2 General inspection ...................................................................................................................... 56
9.1.1.3 Rolling-contact bearing inspection .............................................................................................. 56
9.1.1.4 Changing bearings when using permanently lubricated rolling-contact bearings....................... 57
9.1.2 Maintenance................................................................................................................................ 57
9.1.2.1 Safety instructions for maintenance............................................................................................ 57
9.1.2.2 Maintenance intervals ................................................................................................................. 57
9.1.2.3 Rolling-contact bearings.............................................................................................................. 58
9.1.2.4 Cleaning the spent grease chamber ........................................................................................... 58
9.1.2.5 Lubrication................................................................................................................................... 59
9.1.2.6 Maintaining the cooling water system......................................................................................... 60
9.2 Repair.......................................................................................................................................... 61
9.2.1 Removing and installing the protecting ring................................................................................ 61
9.2.2 Connecting the speed encoder ................................................................................................... 62
9.2.3 Replacing or adjusting the speed encoder.................................................................................. 62
9.2.4 Replacing the DRIVE-CLiQ interface (encoder module) ............................................................ 63
9.2.5 Screw-type connections.............................................................................................................. 63
10 Spare parts.............................................................................................................................................. 65
10.1 Ordering data .............................................................................................................................. 65